Patch 8 for iLink Pro 1.1 SP4 (Build 90) replaces the following files with the versions listed: TwisterIIRacksDCC.dll : 1.1.4.94 ProgrammingProject.dll : 1.1.4.91 MethodEditor.dll : 1.1.4.94 ExecutionManager.dll : 1.1.4.94 GanttChart.dll : 2.2.3198.14366 WrapperDCC.dll : 1.1.4.91 SharedClasses.dll : 1.1.4.92 Fixed in Patch 8: -Stack Storage source rack would sometimes switch to destination rack in the middle of a run. -Now allow a material name to start with a number Fixed in Patch 7: -Improved reliability of method execution. -Improved reliability of Gantt Chart Fixed in Patch 6: -Shutdown and restart of some Resources caused an unhandled error -Start at Selected Line does not always work -Gant Chart refresh speed improvement for long methods Fixed in Patch 5: -No longer reset Parameter values between runs. Fixed in Patch 4: -We currently swap the source rack to a destination at the end of a run The observation is that when the instructions are interleaved such that run 5 leaves a rack empty but run 4 finishes after, we place the material from run 5 back to its destination. The fix is to swap from destination to source only when the run id matches the run that made the rack empty. Fixed in Patch 3: -Twister II Storage Racks only accept change in source of destination for first material. Fixed in Patch 2: -The Skip Move option on the Error Dialog was not working properly. Fixed in Patch 1: -Utilization of multiple Twister II Storage Racks not working properly. Patch Instructions ------------------- 1. Double click on the 'Update.exe' file which will automatically install the new files.